Skip to content

Our Approach

How We Implement and Scale Manufacturing Solutions

You don’t need another tool—you need outcomes. This page is the hub for how Connected Manufacturing implements, operates, and improves Siemens Opcenter across MES, APS, Industrial IoT, and Conversational AI. We start with a road map, stand up integrations, harden hosting, and run Ops with 24×7 reliability. Then we use data and change management to lock in gains and expand value. Why this approach works: manufacturers that combine disciplined execution with data-driven improvement scale faster and sustain results (Deloitte, 2025); (McKinsey, 2025). Standards like ISA95 ensure the stack lines up from enterprise to control, while ISO/IEC 27001 and NIST guidance keep environments secure and resilient (ISA, 2025); (ISO, 2022); (NIST, 2020). 

CC-58
CC-55

Our Services

Understanding how we Can Help 

Our approach to Manufacturing Operations Management (MoM) covers the full lifecycle—from strategy to daily operations. We design pragmatic roadmaps (discovery → pilot → rollout → optimize), implement Opcenter MES, APS, and Insights Hub with proven patterns, and manage them with 24×7 reliability. Along the way, we publish knowledge topics with quick synopses so teams can learn fast, and we anchor everything with recommendations and clear FAQs that make it easy to start.

  • Our services from strategy to managed operations 
  • A pragmatic implementation road map (discovery → pilot → roll-out → optimize) 
  • Knowledge topics tied to each service, with 1-sentence synopses 
  • Clear recommendation and FAQs to start quickly 
 

Offering the Different Services Manufacturers Need

Strategy & Advisory 

Outcomes: a prioritized roadmap with payback windows, architecture options, and risk controls. 
Deliverables: value model & ROI case, ISA95 aligned architecture review, data readiness scorecard, transformation KPIs, change plan. 

Implementation & Integration
Outcomes: paperless execution, traceability, and constraint-aware schedules wired into ERP/QMS/PLM. 
Deliverables: Opcenter config, equipment/test connectors, ERP/QMS/PLM interfaces, data migration, role-based work instructions. 
Hosting & Managed Cloud 

Outcomes: secure, performant environments with tested backup/DR and RTO/RPO. 
Deliverables: SaaS/private cloud setup, SRE runbooks, monitoring/alerts, backups, DR exercises.

Staff Augmentation 

Outcomes: surge capacity without slipping governance or validation. 
Deliverables: solution architects, MES/APS engineers, PMs, SMEs embedded in your team. 

Support & Maintenance 

Outcomes: predictable uptime and upgrades. 
Deliverables: SLAs, break/fix, patching, version upgrades, regression tests. 

Managed Services / Operations 

Outcomes: 24×7 monitoring, incident response, capacity management, scheduled improvements. 
Deliverables: SLOs/KPIs, incident & change cadence, quarterly value reviews. 

Training & Enablement 
Outcomes: adoption that sticks. 
Deliverables: role-based training, admin certification paths, SOPs, knowledge base. 
Validation & Compliance 

Outcomes: rightsized CSV/validation and 21 CFR Part 11 alignment. 
Deliverables: validation plan & traceability matrix, test protocols, electronic signatures/audit trails approach, audit preparation. 

Data & Analytics 

Outcomes: OEE/quality/energy visibility and yield-oriented troubleshooting. 
Deliverables: modeled data layer, KPI definitions, dashboards & alerting, loss-tree and root-cause routines. 

Change Management & PMO

Outcomes: adoption, behavior change, and realized benefits. 
Deliverables: stakeholder mapping, communications plan, training waves, benefits tracking, governance ((Prosci, 2023)).

Defining an Implementation Roadmap

CC-57
Discovery
(Weeks 0–2)

Objectives, constraints, validation scope, data inventory, ISA95 mapping; define pilot slice. 

Design & Prototype
(Weeks 3–6)

Configure MES/APS/IIoT baseline, interface contracts, migration plan, security & backup design (ISO-aligned). 

Pilot
(Weeks 7–12)

Connect equipment and sources, enforce eDHR/eBR, finite-capacity scheduling, OEE base-lining, change enablement.
 
Rollout
(Week 13+)

Expand cells/lines/sites; formalize governance, training, and quarterly value reviews. 

Optimize
(Ongoing)

Tune rules & heuristics, improve loss trees, automate packets/reports, and iterate on KPIs ((FernandezViagas et al., 2022); (Deloitte, 2025)). 

Typical time frames depend on scope and data readiness; we right-size validation and controls to your environment ((FDA, 2003; 2023); (NIST, 2020)).

From Theory to Practice

Improve Knowledge Topic

Explore a curated library of essential manufacturing topics. Each entry includes a concise 200-word overview for quick learning and an in-depth 800-word article for deeper insights into standards, systems, and best practices.

 

Roadmaps that pay back

Build a 90-day plan that sequences MES, APS, and IIoT by value and readiness (ties to ROI and risk). 

Read More

Opcenter integration patterns

Proven interface contracts for SAP/QMS/PLM and equipment/test systems—no swivel chair. 

Read More

Finite-capacity scheduling, explained

How APS models constraints (skills, changeovers, cleanrooms, reentrant flows) to improve promise dates. 

Read More

Data migration that doesn’t bite

Master data, genealogy, and history import strategies that avoid downtime and bad WIP. 

Read More

Hosting, backups & DR

Design RTO/RPO, test restores, and run-books that satisfy IT/security and auditors. 

Read More

24×7 managed operations

What great monitoring catches before operators do; incident & change cadences that reduce risk. 

Read More

Validation & 21 CFR Part 11

Practical, risk-based CSV and electronic signatures/audit trails that pass inspections. 

Read More

OEE & loss-tree fundamentals

Standardize availability, performance, and quality so improvements stick across plants.

Read More
 

Why this approach works

(Weeks 0–2)
Discovery

objectives, constraints, validation scope, data inventory, ISA95 mapping; define pilot slice. 

(Weeks 3–6)
Design & Prototype

configure MES/APS/IIoT baseline, interface contracts, migration plan, security & backup design (ISOaligned). 

(Weeks 7–12)
Pilot

connect equipment and sources, enforce eDHR/eBR, finitecapacity scheduling, OEE baselining, change enablement. 

(Week 13+)
Rollout

expand cells/lines/sites; formalize governance, training, and quarterly value reviews. 

(ongoing)
Optimize

tune rules & heuristics, improve loss trees, automate packets/reports, and iterate on KPIs (FernandezViagas et al., 2022); (Deloitte, 2025). 

Frequently Asked Questions

References

Deloitte. (2025, May 1). 2025 Smart Manufacturing and Operations Survey. https://www.deloitte.com/us/en/insights/industry/manufacturing/2025-smart-manufacturing-survey.html 
This report is a current benchmark on smart manufacturing adoption, budgets, and scaling obstacles. It analyzes results from 600 U.S. manufacturing leaders, covering investment focus, data readiness, talent, cybersecurity, and value realization. Two points matter for the Improve pillar: investment is climbing while skills/data remain gating, and quickwin pilots that scale outperform bigbang transformations. 

Fernandez-Viagas, V., Ruiz, R., & Mula, J. (2022). Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study. Computers & Industrial Engineering, 171, 108424. https://doi.org/10.1016/j.cie.2022.108424 
This paper provides empirical evidence for constraint-aware, information-rich scheduling. Through computational experiments, it compares static plans to schedules that incorporate fresh shopfloor signals under variability. The lessons for continual improvement are that live data and explicit constraint modeling improve service levels and reduce firefighting. 

Food and Drug Administration (FDA). (2003). Guidance for Industry—Part 11, Electronic Records; Electronic Signatures—Scope and Application. https://www.fda.gov/media/75414/download 
This guidance underpins MES/eDHR programs where electronic records and signatures must withstand audits. It clarifies the scope of 21 CFR Part 11 and expectations for risk-based validation, audit trails, and security. Practically, it argues for aligning validation to risk and ensuring the integrity/traceability of regulated records. 

International Organization for Standardization (ISO). (2022). ISO/IEC 27001:2022—Information security management systems—Requirements. https://www.iso.org/standard/27001 
This standard defines the ISMS requirements relevant to hosting/managed cloud and on-prem MoM environments. It details risk-based controls and continuous improvement practices, aligning with ISO 27002. Adopting 27001 supports defensible governance for backups/DR, access, and monitoring in runstate operations. 

International Society of Automation (ISA). (2025). ANSI/ISA95.00.012025 (IEC 622641 Mod): EnterpriseControl System Integration—Part 1: Models and Terminology. https://www.isa.org/products/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise 
ISA95 supplies the layered model and vocabulary that connect enterprise systems with manufacturing operations. Part 1 defines objects and information exchanges used to map products, materials, equipment, personnel, and events across Levels 3–4. Using this common language reduces integration rework and accelerates delivery across MES/APS/IIoT. 

McKinsey & Company. (2025, March 11). Powering productivity: Operations insights for 2025. https://www.mckinsey.com/capabilities/operations/our-insights/powering-productivity-operations-insights-for-2025 
This research summarizes where operations leaders are capturing value and why some transformations sustain results. It synthesizes survey and case evidence on workflow redesign, governance, and capability building across industries. For improvement, two implications stand out: leadership accountability and ongoing skills development drive durable outcomes, and live data shortens the path from detection to decision. 

National Institute of Standards and Technology (NIST). (2010; updated 2021). SP 80034 Rev.1—Contingency Planning Guide for Federal Information Systems. https://csrc.nist.gov/pubs/sp/800/34/r1/upd1/final 
This guide structures backup/DR planning and testing—the backbone of reliable runstate operations. It explains contingency planning lifecycles, roles, and exercises, and ties them to business impact. Two practical takeaways are to document and test recoverability and to set RTO/RPO aligned to the criticality of each system. 

National Institute of Standards and Technology (NIST). (2020). SP 80053 Rev.5—Security and Privacy Controls for Information Systems and Organizations. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r5.pdf 
This catalog provides tailorable security and privacy controls for enterprise and OT adjacent systems that support MoM. It lays out control families for governance, access, monitoring, and resilience, and maps to risk management frameworks. Implementing a rightsized 80053 baseline makes security part of day-to-day operations, not a bolt-on. 

Pinedo, M. L. (2022). Scheduling: Theory, Algorithms, and Systems (6th ed.). Springer. https://link.springer.com/book/10.1007/978-3-031-05921-6 
Pinedo’s text is the standard foundation for APS and constraint-aware scheduling used in modern MoM stacks. It spans single-machine through jobshop and reentrant flows, with heuristics, algorithms, and system design tradeoffs. The enduring lessons are that constraint-aware methods beat naive rules under variability and that implementation detail and data quality matter as much as the algorithms. 

Prosci. (2023, May 26). Best Practices in Change Management—Research highlights. https://www.prosci.com/blog/change-management-best-practices 
Prosci’s multiyear research links strong change practices to project success rates. The summary highlights adoption enablers, roles, and the value of integrating change management with project management. For improvement, it reinforces that behavior change, communications, and sponsorship are the multipliers that keep benefits from fading after go-live.